EIA

RIEW – Shumen admits Gabritsa Wind Park to procedure for Environmental Impact Assessment 

On 12.10.2021 the Regional Inspectorate for Environment and Water (RIEW) – Shumen admitted to procedure for Environmental Impact Assessment (EIA) the investment proposal of WPG EOOD for construction of a wind park for electricity production – “Gabritsa” and construction of an overhead line (electric cable 110kV), connecting the future substation of the park with the grid of the Transmission System Operator (TSO).  The EIA procedure is part of the execution of any major investment project. The purpose of the EIA is to identify any possible impact on the environment and human health as a result of the construction and operation of large-scale investment proposals.